New Thames Tunnel
Series
- Series Name
- British Movietone News
Issue
Story
- Story No. within this Issue
- 4 / 6
- Summary
- MOVIETONE CARD TITLE: The Purfleet Tunnel. DESCRIPTION: London’s River - and a progress report on the tunnel being built between Dartford and Purfleet. The completed tunnel will cost something like eleven million pounds, and should be ready within four years. SHOTLIST: Pan of river. MS going down in lift. CU lift at base of tunnel, men leaving. GV tunnel. MS tunnel. MS men shovelling chalk. CU man with lever. MS men working. CU men same. CU same. CU man drilling chalk. MS same. CU same. Men enter pressure cabin. MS in pressure cabin. Pan of gauges. CU gauge. MS men leave cabin. Map of project.
- Keywords
- Buildings and structures; Industry and manufacture; Engineering
- Locations
- River Thames; Kent; England; Dartford
- Footage sources
- Pathe
- Card file number
- 73101
- Credits:
-
- Commentator
- Geoffrey Sumner
- Length of story (in feet)
- 99
-
Film clip
• The first time you use this link in a session, you will need to log on at the British Movietone website and then click this icon again to see the film. For the remainder of the session, this link will take you directly to the film.
This series is held by:
Film Archive
- Name
- AP Archive
- info@aparchive.com
- Web
- http://www.movietone.com
- Phone
- +44 (0)20 7482 7482
- Series held
- View all series held by AP Archive
Record Stats
This record has been viewed 63 times.