Results

2 results | Page 1 of 1
« First
‹ Prev1Next ›
Last »
Sort results by
  1. Framed in Steel (1985 Video)

    Subject
    Engineering
    Distribution
    Sale, Videocassette. VHS. col. 12 min., 1995 sale: £30.00 (inclusive)

    Shows the building of an office and a warehouse in steel. The elements are prefabricated in order to accelerate the construction time. Looks specifically at various technical details, giving an idea of the...

    DVD Find DVD Find Other Other To order To order
  2. Hilton: Palacio del Rio (1968 Film)

    Subject
    Engineering
    Distribution
    Film (16mm)

    The 21-storey Hilton Hotel in San Antonio, Texas, was built in nine months. This short construction time was made possible by pre-casting each room unit at a nearby pre-casting yard. Before being...

    DVD Find DVD Find Other Other Record only Record only